About this timelapse
Watch the Timelapse as Construction and engineering raise a hyperbolic cooling tower in a geothermal basin. The Building process starts on levelled gravel, casts the ring foundation and twelve columns, then grows the concrete shell to the throat and crown.
This AI architecture makes a major industrial work readable: among infrastructure and plant, the site shows how form, thickness, and the open colonnade work as one system.
Watch the full transformation and subscribe to Rapid Build Lab.
#timelapse #buildingsimulation #CoolingTower #Hyperboloid #GeothermalPlant