Rapid Build Lab AI
Timelapse #73

From empty grass to a neighborhood basketball court

Published on by Rapid Build Lab AI

Find more timelapses
Project concept

From empty grass to a neighborhood basketball court

From empty grass to a neighborhood basketball court

About this timelapse

Watch the Construction Timelapse of a neighborhood basketball court. The Building process turns an open grassy clearing into a ready-to-play structure with AI architecture and visible site work. Engineering and infrastructure from leveling to finished hoops. Subscribe for more construction timelapses.

#timelapse #buildingsimulation #BasketballCourt #NeighborhoodPark #AsphaltSurface

From concept to result

The images used to create the video

Single static photorealistic image for a vertical 9:16 YouTube Shorts construction timelapse. Fixed camera at eye level about twelve meters from the center of the scene, slight high angle, 24 mm equivalent focal length, wide framing leaving free margin around the central area. Soft daylight with partially cloudy sky, soft diffuse shadows, natural neutral color grading. Left of the frame, about 20% of the width from the left edge, a large mature oak tree with thick rough brown-gray trunk, extended green canopy occupying the upper left. Right side, a light gravel path starting from the foreground and receding into the background, occupying about 15% of the right of the frame. Central background a low red brick building partially visible behind the vegetation. The ground is a uniform well-kept green grassy lawn throughout the central and surrounding area, without excavation traces or materials, with some taller grass clumps at the edges of the path. No constructed element at the center, only the open space of the lawn extending freely.
Starting image
Single static photorealistic image for a vertical 9:16 YouTube Shorts construction timelapse. Fixed camera at eye level about twelve meters from the center of the scene, slight high angle, 24 mm equivalent focal length, wide framing leaving free margin around the central area. Soft daylight with partially cloudy sky, soft diffuse shadows, natural neutral color grading. Left of the frame, about 20% of the width from the left edge, a large mature oak tree with thick rough brown-gray trunk, extended green canopy occupying the upper left. Right side, a light gravel path starting from the foreground and receding into the background, occupying about 15% of the right of the frame. Central background a low red brick building partially visible behind the vegetation. The ground is a uniform well-kept green grassy lawn throughout the central and surrounding area, with some taller grass clumps at the edges of the path. At the center of the area, a construction rectangle of about 14 by 8 meters is partially prepared: two gray concrete plinths already cast at the ends of the long side, one near the camera and one far, each with a vertical galvanized steel tube of 3 meters already fixed and protruding. The half of the rectangle closer to the camera has a granular mix subbase layer leveled and partially covered by gray base asphalt, while the far half remains still dug open lawn. Some material bags and a small concrete mixer resting on the left edge of the site, without covering the structure. Two workers with helmets and high-visibility jackets standing near the near plinth, one holding a tape measure and the other pointing.
Construction in progress
Single static photorealistic image for a vertical 9:16 YouTube Shorts construction timelapse. Fixed camera at eye level about twelve meters from the center of the scene, slight high angle, 24 mm equivalent focal length, wide framing leaving free margin around the central area. Soft daylight with partially cloudy sky, soft diffuse shadows, natural neutral color grading. Left of the frame, about 20% of the width from the left edge, a large mature oak tree with thick rough brown-gray trunk, extended green canopy occupying the upper left. Right side, a light gravel path starting from the foreground and receding into the background, occupying about 15% of the right of the frame. Central background a low red brick building partially visible behind the vegetation. The ground is a uniform well-kept green grassy lawn throughout the central and surrounding area, with some taller grass clumps at the edges of the path. At the center, a complete basketball court of 14 meters by 8 meters with uniform gray-blue asphalt surface, sharp white lines of the court and central circle, two complete hoops with white polyethylene backboards and orange rims on galvanized steel supports fixed to the concrete plinths. Free lawn space around the court. Two boys in sports clothes on the court, one in the act of shooting towards the near hoop and the other in defensive position, with an orange ball in the air.
Final result