Rapid Build Lab AI
Timelapse #23

🏗️ Timelapse | Cooling tower | Hyperboloid shell

Published on by Rapid Build Lab AI

Find more timelapses
Project concept

🏗️ Timelapse | Cooling tower | Hyperboloid shell

🏗️ Timelapse | Cooling tower | Hyperboloid shell

About this timelapse

Watch the Timelapse as Construction and engineering raise a hyperbolic cooling tower in a geothermal basin. The Building process starts on levelled gravel, casts the ring foundation and twelve columns, then grows the concrete shell to the throat and crown.

This AI architecture makes a major industrial work readable: among infrastructure and plant, the site shows how form, thickness, and the open colonnade work as one system.

Watch the full transformation and subscribe to Rapid Build Lab.

#timelapse #buildingsimulation #CoolingTower #Hyperboloid #GeothermalPlant

From concept to result

The images used to create the video

First image used to create the timelapse
Starting image
Second image used to create the timelapse
Construction in progress
Third image used to create the timelapse
Final result